Exclusive Tour Speical!+






EXCLUSIVE:
Tour round the building site

Recently, the blog team got an exclusive tour around the building site we noticed lots of numerous wires weaving around the building insulating, transferring power around the site. We also noticed that the workers on site had left mysterious chalk reminders on the wall to plan out what to do.

We also surveyed that the rooms were cold and smelt musty due to the fact the builders haven’t finished padding it. As we predicted the builders have constructed modern skylights, which close automatically when they feel rain also you can open them with only pressing a button! How amazing is that?

Even more interestingly, the materials come from as far as Brazil, Indonesia, China, Sweden and Belgium! Uncannily, the whole building is held together by a few my newt (9 cm) pieces of metal! Can you believe it?

Have you ever wondered if our old school heating would be improved? Well we found out! The new buildings heating are going to be 78% more efficient. This means that there will be no more silly noises!!!

Also, for your interests we found out that speed limit is only 5!!

By Kizzy, Katie (Encouraged by Bella)!


Thursday, 4 July 2013

The roof is being insulated!

The new building is going to be warm because you may see that the roof is being padded in cosy insulation to make the key stage one warm. The builders have been dragging large blocks of insulation the newly constructed roof to there rightful place. You can also see that the glass is going to be placed in the top by the west entrance.Everyone has been especially proud of the builders recently despite the fact they burst the water pipe leading to the boys toilet and kitchen.
 
By Hamish, Liam, Molly, Katie, Kizzy and Bella 






Wednesday, 26 June 2013

Windows Are In The Panes!

From this evidence, it looks like we’ll get an amazing view from our new extension due to the fact the builders have been carefully been placing the windows into their panes! It’s interesting to know that the builders are hard at work double checking that the windows are safe and secure!

You can see, that they are measuring up the outside boarders of the windows, and also adding panes and interior designs must be in progress.
Next week, we’ll find out how the interior designs are getting on.



By Katie, Kizzy, Hamish , Jude , and Liam.




Thursday, 20 June 2013

The glass has come


From the pictures below you can see that the builders have ordered thick glass for the windows of the brand new structure. Great deals of effort have gone into this, that’s why we saw some of the builders making last checks, in case that any mistakes were made. More importantly, this is a sign that the building is near completion and we wont have long to wait before the extension will be finalized.

The progression on the sight is extremely well done, looking back you can see that all the machinery and diggers have gone mainly because most of the groundwork is done. This proves that the building may be finishing before it was predicted to be done! But who know?


By Molly and Katie
Pictures by Hamish






Thursday, 13 June 2013

Wood Chopping


From the pictures bellow, you can see that all the builders have been working extremely hard, chopping thin slabs of wood and almost completing the inertia walls. Also, the wooden planks are being cut down to size and they are really thin.

More importantly, the roof of the structure is finally coming together and very soon it will be finished so they can start on the inside designs and features of the building.

By Katie, Liam, Molly and Kizzy.


Thursday, 6 June 2013

Messy Work!




As you can see, white insulation and water proofing has been added to the wooden skeleton of the new building. Since the building work started, many improvements have been completed throughout the extension. During this process, the building site has become crowded with building materials as well as becoming overgrown, messy but still in any weather the builders are fully dedicated to improving our school.


More importantly, we can tell the rest of the structure will be completed soon enough, next week the bloggers will report to you with extra news on the progress and maybe more!


By Hamish, Molly and Katie.

Thursday, 23 May 2013

Sky lights arrive!


The school’s new building is progressing well; sky lights are being constructed; the interior walls have been made and it’s all coming along quickly.
As you can see, the new wooden sky lights have been placed and seem to be developing quickly because the builders are working on them at every opportunity also they need to finish the construction fast . Therefore they will be able to start on the other things that need to be done such as the staff car park plus interior features. Next week the blog team will update a status and talk about the progress.

By Kizzy, Katie and Hamish J


Thursday, 16 May 2013

Busy Builders!






As the week progressed we spotted that the building site has become very messy, as well as that we think that the holes in the roof are skylights!



We noticed that the extension has been built in a hole but why? The bloggers think it’s because when the rest of the structure has been built the builders may cover it up.

Next week we will try and ask the builders whether we were right during our tour on Tuesday!

We're very excited!



By Katie and Kizzy.  

Thursday, 9 May 2013

Hard Work With Building Blocks!

As you can see the builders have been hard at work shifting heavy building blocks. Also, this is the builders crafting bench and they are working hard chopping the new blocks to fit in the spaces that need to be filled.




By Katie & Jude

Wednesday, 1 May 2013

Insulation Blocks


Although you may not be able to tell by the pictures beneath, the builders have been hard at work creating the internal walls. Soon we won’t be able to view the inside due to the fact they are starting to build the outer walls.

 

Interestingly, the builders constructed some of the walls using large, rectangular insulation blocks.

 
By Tilly and Liam



Tuesday, 23 April 2013

First week of the summer term


As we return from the Easter holidays, we have noticed internal walls are now being constructed despite the recent poor weather.  Interestingly, the roof structure continues to grow as well as the new corridors taking shape slowly.
 
Let's hope the recent warmer weather continues.
Molly (Editor), Kizzy, Liam & Jude.








Monday, 15 April 2013

WOW !!!

Wow ! look at all the progress the builders have made over the Easter holidays.






Wednesday, 27 March 2013

The structure is taking shape

The big crane lifted the enormous wooden structure into place. We could not believe how big it all looked. It was all very exciting. We are on Easter holidays for the next two weeks. We are very excited about seeing what the new building will look like on our return to school.




The crane arrives

Today the crane arrived to put the building structure up. It was a massive crane and we could see it from the other side of the field.